| Crane placing lumber onto the main floor for the interior/exterior walls. |
| Walkout basement. In law suite to the left and glass doors to the right. |
| Footers for the deck outside the walkout. Two sets of french doors will be on the main floor to access the deck. |
| Basement bathroom to the left. Theatre/study/kid's playroom to the right. Erin and I will determine this at a later date. ;) |
| Base of the stairwell. In law suite/ 4th bedroom behind stairs. Photo taken from the basement family room. |
| Walkway from the basement family room to the mechanical storage room to the right and 4th bedroom ahead. |
| Bathroom and mechanical/storage room. |
| Massive storage. |
| 4th bedroom |
| 4th bedroom lookout |
| Closet in 4th bedroom. |
| First floor start up. |
| Basement wrapped and the first floor begins! |
| Direct "look" into the house from what will be the front door. |
| Where the chainsaw sits will be the future dining room. The kitchen will sit and hug the south and west wall. |
| View of the westside of the house. 4th bedroom window visible. Above that bedroom will be the Erin's kitchen!!! |
| Good looking framework! |
| Headers for the mechanical room and bathroom. |
| Stair base. |
| Downstairs family room. Directly above this will be the main floor family room and stone fireplace. |
| Not gonna drop that! |
No comments:
Post a Comment