| Roof for the garage is complete, and ready for the metal. |
| 40 feet straight up in the fireplace. |
| Garage roofline and window above the garage doors. |
| Garage roof. |
| From the garage looking into the first floor. |
| Mudroom framing continued. |
| Inside the master bath. |
| Toilet and shower draining for the master bath. |
| Venting out the roof above the laundry room and 2nd floor bath. |
| Shower drain in 2nd floor main bathroom. |
| 2nd floor main bathroom. |
| Basement shower being set and plumbed. |