Roof for the garage is complete, and ready for the metal.





40 feet straight up in the fireplace.


Garage roofline and window above the garage doors.

Garage roof.

From the garage looking into the first floor.

Mudroom framing continued.


Inside the master bath.

Toilet and shower draining for the master bath.

Venting out the roof above the laundry room and 2nd floor bath.

Shower drain in 2nd floor main bathroom.


2nd floor main bathroom.

Basement shower being set and plumbed.