Initially we weren't supposed to start excavating the basement until today, but our contractor John called and said that the concrete guys had a change in their schedule and were able to come a day earlier than anticipated!
A few 20' tall piles of dirt later, we have a walk-out basement, buttress walls, and frost footings - and sweet ones at that! So check out some of the great pics, some of which were taken from the top of those piles. :)
Leo scoping out the trenches and frost footings. |
Looking at the future walk-out side of the basement and the buttress walls. |
You can see the beginning of the footprint of the house. The center footing is the load bearing wall. The two "U" shaped footers are the makings of the staircase. |
View from the west side of the house. It was super cold and windy today. |
This picture gives you an idea of how much dirt has been moved. To the far left of the picture is the footer walls for the garage floor. |
We only have until 6:30pm to check out the progress. We're going to have to start visiting during the afternoon once Daylight Saving Time hits. |
Can't wait for this bad boy to start filling up the wall forms! Only a few days away!! |
The south facing wall - future walk-out basement. |
Great view from the top of our dirt pile! :) |
Some of these trenches were 14' down. |
Holy hole! Plus holy dirt! Can't believe it is beginning to take shape. You must be soooo excited and we are all excited for you. Love you mom